The technological sequence of the painting work

The technological sequence of the painting work

DRAWING WALLS AND CEILINGS

First, the surface of the wall or ceiling must be cleaned of dirt, get rid of the remnants of the background and the old paint. If the walls are under the influence of mold, they must be eliminated. There are special chemicals to facilitate these preliminary works.

The technological sequence of the painting work

Painting works

Building standards define three types of colors for quality: simple, improved and high-quality, and a list of technological procedures that need to be done so that the corresponding color meets the sanitary, technical or aesthetic requirements.

The technological sequence of the painting work

TEHNOLOGIJA MALARSKIH DEL

Until the beginning of the painting completion, all prefabricated and general construction works for the construction of walls, ceilings, partitions and roofs must be completed; wet brick walls and joints of floor panels, partitions, as well as crossing points for sanitary water pipes; built-in doors and mezzanines and inserted closets; heating, plumbing and sewage systems are installed and tested on the ground; installed electrical equipment and appliances; purified residue and material residues. Completing these requirements will allow the exclusion of cases of damage to the painted surfaces. Painting work is recommended as a rule start on the upper floors.

The technological sequence of the painting work

Engineering and replacement of communications.

The professional module's work program was developed on the basis of a federal state education standard for vocational vocational education (hereinafter text: non-governmental organizations) 270802.08 Master's degree in dry construction.

The technological sequence of the painting work

Painting works. Lining and painting of walls, ceilings.

To improve adhesion, each layer should be treated with a coating. For hygroscopic surfaces, "breathable" is recommended - ready to use white polymer emulsion. Depending on the degree of absorption of the surface - from 0.07 to 0.1 kg / m2. Work is carried out at a temperature of +5 to +25 ° C, apply the solution with a brush or roller. The drying time of one layer is about 3 hours. The difference between the final drying of the base layer and the subsequent application of the whale should be minimal - this will help prevent the dust from leaking to the surface.

Technopromexport jobs Crimea

Technopromexport jobs Crimea

LLC "VO" Technopromexport "

Technopromexport is one of the leading companies in the world market for energy facilities construction. The main activity of Technopromexport is the implementation of energy projects of any complexity on the key. During the construction of energy facilities, the client has a wide range of services - from planning and surveying to managing these facilities. Tehnopromexport builds: thermal power plants (steam gas, gas turbine, geothermal energy, diesel fuel), hydroelectric power stations, power stations and stations, as well as the export of electricity.

Technopromexport jobs Crimea

You are here

It turned out that "Energetsko podjetje" "Kommersant", LLC "VO" Technopromexport "(TPE)" Rostec "will sell the electricity and capacity of thermal power plants in Crimea, which should be completed in 2018. Therefore, TPE should repay lending in the amount of 46 billion rubles, attracted by bank projects, in particular the Crimean RNKB. At the same time, the company is now a defendant in the German Siemens application, requesting the return of turbines from Crimea, allegedly delivered there, which avoided the sanctions apparently produced by Siemens JV and Power Machines in St. Petersburg.

Technopromexport jobs Crimea

Technopromexport is looking for a contractor to work on two thermal power plants in the Crimea

Purchases are called "execution of orders and orders of the order manager of the organization Sevastopol and Simferopol PGU TPP". The cost of the first contract is 745.79 million rubles, the other - 749.2 million rubles.

Technopromexport jobs Crimea

Technopromexport jobs Crimea

Moscow, March 14 INTERFAX.RU - The new energy units Tampere Simferopol (Tauride) and Sevastopol (Balaklavskaya), 470 MW, will be launched at the end of May, Russian President Vladimir Putin told Russian Energy Minister Alexander Novak.

Technopromexport jobs Crimea

Siemens has accused Technopromexport of fraud in obtaining turbines for the Crimea

Moscow on December 5th. INTERFAX.RU - JSC VO Tekhnopromexport was deceived by Siemens and the joint venture Siemens gas turbine technology and under the pretext of building a thermal power plant in Taman got equipment for the construction of a thermoelectric power plant in Crimea, a representative of the German company Mikhail Ivanov told the court.

Wooden floor technology in the gym

How to change the wooden floor in school?

Supervisors need to replace the floor in the school gym. Tell me, what are the possibilities for the quality of wooden coating for such spaces. Sincerely, Nelli Ivanovna.

Wooden floor technology in the gym

Wooden floor in the gym

The effectiveness of sport depends directly on the organization of training conditions: the quality of equipment, ventilation systems and other components. Particular attention should be paid to choosing the floor covering for the gym because it has to be durable, safe, easy to clean and strong enough. To date, there is a wide range of flooring materials in the gym, and among the most popular are wooden varieties.

Wooden floor technology in the gym

Ground floor

The deck for sports is made of softwood wood, placed on the edge of the roofing method of laying. This design is suitable for mounting the floors of sports and gymnasiums, scenes and other floors exposed to high static and dynamic loads. Despite their high thickness, these soils are well tightened and without the use of special devices. In the device of such soil is the very important quality of wood, its moisture and the geometry of wood.

Wooden floor technology in the gym

Floor coverings in the gym

Professions in the gym are serious loading not only for the person. The floor in the gym must bear the weight of the person and the weight of the simulators and the numerous loads arising from the active activities of athletes (jumping, running, sharp dropping of projectiles). In addition, the ground must be very strong (otherwise it can fail under the gravity of a serious simulator), it must be sufficiently elastic (to extinguish the shock after jumping), but not become a trampoline. Slippery flooring will ensure a high risk of injury, but too sticky bottom will deprive you of the joy of active games. In addition, the floor must have a completely smooth surface without unnecessary gutters and bulges, each of which can damage the athlete.

Wooden floor technology in the gym

Wooden floor in the gym

The main requirements for flooring in gymnasiums - the ability to transmit strong dynamic loads, sufficient stiffness, at the same time the elasticity of the floor, flat surfaces without bumps and mammals. In this case it is possible to ensure the safety of athletes and the quality of training.

Workbook for painting

Workbook for painting

L. F. Frolova

If you continue to use our site, you consent to the processing of cookies, user data (location information, type of OS and version, browser type and version, device type and screen resolution, the source from which the user came to the site from which pages or advertising, the operating system language and the browser, which pages the user opens and which buttons the user clicks; ip-address) to manage the site, perform restart, and perform statistical surveys and surveys. If you do not want to process your data, exit the site.

WORKSHOP About the performance (independent) of extra-curricular work on "Tehnologija slikarstva" Occupation: 01/08/08 Master of finishing works "

Developer: M.N.Tusinova - Methodologist, teacher of special disciplines GAPOU SO "ZhGK"

Description

We draw your attention to the fact that the BizOrg.su market is for informational purposes only and in no case is a public offer. The price listed for the service "Frolova L.F. Book Technology of painting work. Workbook 5. ed., Deleted" (119 UAH.). There must be no final price of the service. For more information on the availability and costs of these goods and services, please contact Odyssey's online store by phone or by e-mail address.

Workbook for painting

Storage of radio components and technical literature

The independent work of students is intended to deepen the resulting knowledge and skills. Independent work develops thinking, enables identification of cause-and-effect relationships in study material, solving theoretical and practical problems. The methodological instructions are drawn up in accordance with the program of the professional module 05. "Painter and gypsum.

Workbook for painting

Work program on:
Work program of the professional module PM.05 Carrying out work in one or more occupations of workers, jobs: performing of works of art in the profession 13450 Painter

The professional module work program was developed on the basis of a federal state education standard for the vocational education specialization 13450 A painter in terms of mastering the main type of professional activity (VAP):

Sp 163 1325800 2014 download

Sp 163 1325800 2014 download

SP 163.1325800.2014

3. Electronic messages sent through the official web portal of the Ministry of Construction of Russia shall be submitted for consideration to the Citizens' Division. The Ministry provides an objective, comprehensive and timely treatment of complaints. Compliance with electronic applications is free of charge.

Sp 163 1325800 2014 download

Composition of the Rules of the SP 163.1325800.2014 "Structures using plaster and gypsum sheets of the Rules on Planning and Installation" (confirmed by the decision of the Ministry of Construction and Housing of the Russian Federation of 7 August 2014 N 439 / pr)

Dokaks strongly urges users to copy parts of the texts of the regulatory documents in their electronic correspondence. Just try! The technology that automatically creates backlinks to the source of information will impress entrants.

Sp 163 1325800 2014 download

SP 163.1325800.2014 Construction with gypsum and gypsum leaves. Rules of design and assembly.

Document Name:
SP 163.1325800.2014 Construction with gypsum and gypsum leaves. Rules of design and assembly.

Sp 163 1325800 2014 download

Inspection reporting chimney,

Relief Profile - Help - Planet Earth Find the distance of the route using the relief profile .. for this part of the route, and on the chart itself, this section will be highlighted. How to check the surface profile on a shadow chart without having time to develop into an extended shadow of the shelf zone. If necessary, it will be possible to verify this by calculating v. with a different network resolution you need to create graphs. in the qualitative distinction of the gradients on the surface of the profile.

Sp 163 1325800 2014 download

Soundproofing boards ZIPPS Frameless sound insulation of walls and ceilings

Acou-Line acoustical plates are used in the construction of partitions, wall claddings and suspended ceilings. Acu-line sheets are also used as a final pad for ZIPP plates. Special production technology in combination with increased density provides high acoustic characteristics. The material was recommended by NIISF (Moscow) as a system component in standard soundproofed structures Gyproc, for use in residential and public buildings.

Types of facade

Types of facade

The main menu

Decorating facades of private houses does not only perform a decorative role, but also has a certain function. Therefore, the compatibility of methods and materials of decoration with the buildings themselves, isolation should be taken into account at the design stage. And another indispensable condition for the exterior decoration of buildings is its harmonious combination with the surrounding landscape and courtyard space.

Types of facade

Facade decoration: an overview of the main forms of facade design (90 photos of ideas)

The technology and materials for the completion of the facade of the houses are considered at the design stage. The appearance of the building is supposed to fit into the landscape in order to be orderly and beautiful. In addition to the decorative function, the façade finish also performs practical tasks - warming, isolating the structure, protecting the support structure from moisture, wind, steam, temperature drops. The façade lining must be hygienic, resistant to the harmful effects of fungi, molds that often cause the microscope in the walls. How to choose a material for the completion of the facade of a private house? What should focus on?

Types of facade

10 materials for finishing the facade of a private house

Select the material and technology of completing the facade of the house must be in the planning stage. The modern market offers a wide variety of materials, making the facade easy to fit according to a specific budget or design ideas. Choosing the material to finish the facade of a private house, you need to consider two of the most important factors. First, the house must be in harmony with its surroundings, look aesthetically and in accordance with the tastes of the owner. Secondly, the front material must be protected at home, play the role of additional insulation and sound insulation, and protect the support structure against moisture, sunlight and other negative effects. Each final material will not be in line with the tasks, so we will focus on the best options.

Types of facade

Decoration with decorative plaster

Porcelain stone is a modern technological finishing material with good characteristics. The durable and durable plate from porcelain tiles can last for decades. In addition, the material refers to non-toxic and non-flammable coating materials.

Repair concrete blindness do it yourself

Repair concrete blindness do it yourself

Determine the causes of the damage and correct the blind area around the house.

A blank area around the house is equipped almost everywhere. This structural element, with all its simplicity and insignificance, performs extremely important functions. This is a blind area that protects the foundation of the house from the penetration of water or precipitation.

Repair concrete blindness do it yourself

Repair the blind area around the house with your own hands

Every structure that is in constant use has a blank surface. This design plays the role of protecting the foundations and basements from moisture. In addition, the blind area prevents the premature destruction of the foundation. For the production of blind surfaces, paving stones, natural and artificial stone, tiles and concrete are used. To perform a blank surface of the assigned functions, two factors are required: strength and integrity. However, under the influence of certain circumstances in this structure damage can be created.

Repair concrete blindness do it yourself

Repair the blind surface, do it yourself

This article contains brief information about dead spots, the need for its structures, types and types of structures. The main mistakes that are allowed in the construction of a blank area around the house are taken into account, examples of the consequences of these errors are given. Shows the main ways to eliminate emergency situations and repair a blank surface with your own hands.

Repair concrete blindness do it yourself

Need to repair a concrete blank surface and tips

When it comes to the need for waterproofing foundations, first I first think of the simplest and most common solution: we pour the blind area around the house. Such a structure is often found in private construction. But, despite the practicality of the material used, it can not be eternal. Blurring is a real accident that the owner of the building can face. Therefore, to reduce the damage caused by excessive moisture, the concrete blank surface should be repaired without delay and delay.

Correct the blind area around the house - step by step instructions

Repairs should be carried out in the spring or autumn, as during these periods the width of the cracks becomes the largest. Repair of the blank surface of the house is the elimination of the damage caused and the required technology may vary depending on the type of defects and the materials on which the blind surface is carried out.

Which house is a better brick or solid frame

Which house is a better brick or solid frame

Which house is better - brick, slab or solid

Control, care and development services for children of 1.8 years. Developmental, musical, creative activities. The program G. Doman "Wunderkind from the cradle." Safe walks, morning filter, children's menu. Photos and videos.

In which house should they choose the apartment?

Is it true that the brick houses are warmer than the slab? Does one of the "plates" fall into the economic segment? What separates monolithic buildings from a monolithic frame? BN tried to understand the nuances of house construction technologies.

Which house is a better brick or solid frame

Brick, slab or monolith?

During the construction of a multi-storey brick house, two types of brick are usually used - ceramics and silicates. More expensive ceramic bricks have excellent properties - very durable, very heat-resistant and moisture resistant. Silicate bricks are much cheaper but do not tolerate temperature fluctuations and high humidity, so it is practically not used for the construction of high-rise buildings. In the construction industry hollow bricks are increasingly used - cut and porous. Their main advantages are lightness and excellent thermal insulation (due to the presence of air cavities in the structure). However, working with hollow bricks requires special attention - if the solution is dug into the void, all the useful properties of such a brick will disappear.

Which house is a better brick or solid frame

Dom opeke ali monolita?

The portal realty.tochka.net has determined whether the presence of brick walls is important for thermal and acoustic isolation, as spoken by rumors. And what are the advantages of panel and monolithic buildings in terms of thermal and sound insulation, environmental friendliness, speed of construction and power.

Which house is a better brick or solid frame

Monolithic frame or plate: what to choose?

One of the important steps in choosing a home is to find a developer and a residential complex. When choosing the latter, most customers are lost and looking for a house, depending on local and infrastructure needs. However, it is not a secret to anyone that the quality of the building is important, namely, building technology and materials. Monolithic and panel technology are among the most popular. What is the difference between them and the house that needs to be chosen - we continue to understand.

The frame of the house is cheap

The frame of the house is cheap

The scheme works with us

The growth rate of the construction market share in Western and Central Europe, as demonstrated by the factory technology of producing energy efficient frameworks, is truly amazing! In the course of the year 2016, more than 30% of construction permits were issued in some German countries. It is very important for the Ukrainian consumer to see the difference between the frame construction technologies presented in our country. Only the factory-made technology used by DeltaHouse is used in Europe as a segment of the construction of mass capital.

Canadian house for 90 days

Official partner of the Austrian company Egger, own production. We use exclusively European certified materials: OSB Egger (Austria), Neopor expanded polystyrene, TM Basf (Germany)

The frame of the house is cheap

The house frame "turnkey" is cheap: prices that you can not resist

Want to build a house and look for builders who are real experts? Taking into account interesting options at affordable prices? Technologies, projects, materials - which one do you prefer? If the frame design is what suits you, we are ready to start work and ask you not only with high quality, optimal deadlines to complete the task, but also with super prices for all types of facilities from our price list!

You are here

At the same time, the houses have good properties and a lifetime of up to a hundred years. Advantages are also good sound insulation, no shrinkage, environmental safety, as well as aesthetics of appearance. Why are house houses not cheap?

The frame of the house is cheap

What is the low cost frame design?

Our company offers to buy a state framework house on a turnkey basis. We build and install both prefabricated construction options and more complex two-storey houses with attic, terrace and floor. This type of house is economically most advantageous, as the price for this is much lower than for buildings made of brick, concrete and other building materials. The design of such houses does not require a massive base and is relatively inexpensive, while at the same time natural construction materials such as logs, sticks, beams and insulation are used for construction.

Preparation of gravel base

Preparation of gravel base

Preparation of asphalt and gravel substrates

Asphalt base. The laying and compacting processes of asphalt concrete mixtures are the last in the design of the structure of asphalt concrete. The quality of their implementation largely determines the reliability and durability of asphalt concrete pressure.

Preparation of gravel base

Preparing the foundation

When preparing to build the floor of the carriage, remove the upper layer of the ground with the bulldozer, then strengthen the pedestal with the vibrating cylinder from the ground. The base can be sandy, crushed stone, crushed stone-sand, cement concrete, but it can also be from black ruins and mixtures reinforced with astringents. This or that type of foundation has its advantages and disadvantages regarding the efficiency and cost of capital. The basic layer of sand serves to reduce the load of the earth's floor from the movement of machines, accumulate moisture and perform drainage functions on clay soils. Compaction of sandblast is carried out by rollers with a mass of 5-6 tons, vibratory compactors or pneumatic rollers. On the device of the sandy base, in order to be poured into the sand, it is watered.

Legislative basis of the Russian Federation

distribution of jammed ruins (razklintsovka two, three times) by compaction of each fraction. Razklinovovka for single use is allowed for bases. When using a crushed stone of sedimentary rock of a class with a power of less than 600, the device can be used in one phase.

Preparation of gravel base

Preparation for crushed stone foundation

Of course, each of these types has advantages and disadvantages. In order to make the cushion correct, the number of floors in the house, soil type, level of groundwater, climate in the region, buildings, building materials used in the construction of the building, and so on should be taken into account.

Preparation of gravel base

Related articles

In the construction of the chassis, two main things are especially important - sealing materials and technology. Recalling the basics of TOC (technology for organizing road construction), which is being taught in all road specialties, there are a number of requirements and recommendations that are overlooked over time or simply forgotten. For those who are looking for ways to build a solid and durable macadam paint, we would like to make some remarks on this topic.