Laying the floor slab on the screed

Laying the floor slab on the screed

Technology of preparation of base for parquet

We recommend this possibility of laying, but not on the stapler. After preparing and filling the coarse substrate on the floor, we put adhesive plywood squares of approximately 500 x 500 mm in size. The squares should be distributed, i.e. the corners of the four squares must not be connected in one point. Leave the technological distance 2-3 mm between the sheets of plywood for linear compression expansion. Between the plates and the wall between the holes 7-8 mm to the left - fasten them with spacers. Remove the wedges only after completing the laying of the floor board and fill the foam gap. After laying plywood, we must grind. If you have used plywood fitting hardware, make sure that they are 2-3 mm beneath the surface, otherwise the grinding disc may be damaged. Use adhesive on polished and dust-free plywood and lay the floor board.

Laying the floor slab on the screed

Step-by-step technology for laying parquet and parquet on the concrete screed

The laying of parquet on the concrete screed is carried out in several ways: with or without a bonded substrate. Before continuing with the installation process, you must find out what the differences are between them, and in this case you can not do without a layer of plywood. If you have followed the entire installation algorithm correctly, you will eventually get a permanent, stable and durable coating.

Laying the floor slab on the screed

Phases of laying of parquet on concrete screed

Parquet floors are rightly regarded as one of the most popular types of flooring: they look perfectly in all interior photos and fit perfectly into many stylistic solutions, they are resistant to external influences, and can be easily flown with proper care. The procedure for placing parquet (piece and parquet) requires special skills, without which the quality result is impossible. Most often, in the conditions of urban laying of parquet on a concrete spoiler, it is necessary.

Laying the floor slab on the screed

Blog: Parketna dela

Before emptying the surface of the screed, it must be emptied. The coating or other coating will finally remove the surface of the hair and create the first vapor barrier. An example is a cylinder, from corner to exit.