Ground resolution

Ground resolution

Do you have to agree to the renovation of the soil?

The apartment on the 4th floor of the petition building is wooden, with prisons.
Concrete concrete soil.
Ceiling height 2.47 m.
Wood floor should be dismantled and 30 mm thick screeds must be made.
No warm soil, no wired wiring, only screed, linoleum on top.
Question: Is such a change necessary for authorization?

Ground resolution

Overview

As a rule, in the new or necessary major overhaul, it is necessary to decide on the layout of the floor and the choice of screed. Estrich is an intermediate layer between the base of the floor and floor coverings, compensates for unevenness, provides thermal and acoustic insulation, engineering communication with masks.

The main menu

When preparing the renovation project, I put this question to designers. They tensioned and demanded thickness. It will be 27 mm. When they heard this number, they smiled and said, "Do not think about problems, do not keep this in mind." The next was the ambiguity of the language ...

Ground resolution

Change of the soil plan

Changing the ground plan is a rather difficult process from a technical and legal point of view. For example, if you change the floor cover to the same (parquet flooring, tile to tile), then this is a facelift that does not require coordination.
But in the case of replacing linoleum with laminate or tiles (or parquet on tiles), the entire floor structure should be changed under it, as it depends on the type of pressure. This was renovated with renewal.

Ground resolution

Change of the soil plan

- The bottom of the screed space (residential and non-residential) is a change in design. Like, for example, laying on floor tiles. Provision "On conditions and procedure for reorganization and (or) rehabilitation" of 16 May 2013 no. 384 such work relates to the reorganization of the premises. According to this document, they must obtain the approval (permit) of the district administration at the location of the premises. Then the project documentation needs to be developed. Without co-ordination and project work on the floor screed is prohibited. Persons who have carried out an unauthorized reorganization and (or) rehabilitation of the premises shall be liable in accordance with legislative acts. All the consequences of unauthorized actions are eliminated at their own expense.